Construction of Limited Height Subway (LHS) & Road Under Bridge (RUB) using Box Pushing Method
Construction of Limited Height Subway (LHS) & Road Under Bridge (RUB) using Box Pushing Method
Name Of Work: Construction of Limited Height Subway (LHS) & Road Under Bridge (RUB) by Box Pushing Method (01 No. in Malda Division) and other ancillary works in running lines in connection with elimination of the manned level crossings on different sections in Howrah (08 Nos), Asansol (02 Nos) divisions.